
Progress the workscope as directed in accordance with the relevant Task Plans and Procedures.Take part in the loading/discharging/deployment of equipment onto and from the vessel, working as directed by the Shift Supervisor, Deck Foreman or qualified Banksman in compliance with the Masters/Chief Officer's instructions.Maintenance of the cranes and associated equipment including blocks and wires as directed by the Chief Engineer and Chief Officer.Ensure that at no times is the crane lifting any load beyond the SWL of the weakest link in any rigging arrangement attached to the hook and that such rigging is correctly certified.Be aware at all times of the loads involved and limitations of the rigging being used.Complete regular safety tours of the cranes and implement any actions as necessary to maintain the work place in a safe manner.Ensure that all personnel directing crane operations are aware of their personal responsibilities with regard to their work in a safe manner.Safe operation of the ship's crane(s) in accordance with procedures for Lifting Equipment / Operation and in accordance with the crane manufacturer's operating instructions.
